Winding up the Turbine Leg |
Ready for the coming season, our turbine has been refurbished
at the factory in Ireland. So far total generation has been 38,585.000 units of
electricity, although it had been out of action for the two months waiting to be
shipped back to the factory. The turbine
has been refurbished and like so many of these things we are all on a steep
learning curve.
Since being re-installed, our turbine has performed well
over the weekend in all the high winds – Despite the weather conditions
visitors have enjoyed the sanctuary of our luxurious indoor pool.
Talking of alternative power sources, the turbine debate has
once again erupted in the Norfolk media.
Interestingly former local windsurfing champion Simon Sanderson recently
won public funding to build his tidal generator, the sea-spider, the
suggestions are that it should be less of a blot on the landscape – we wait
with interest. Not sure how it will fit
in with the sailing fraternity though.